Repository logo
Log In(current)
  • Inicio
  • Personal de Investigación
  • Unidad Académica
  • Publicaciones
  • Colecciones
    Datos de Investigacion Divulgacion cientifica Personal de Investigacion Protecciones Proyectos Externos Proyectos Internos Publicaciones Tesis
  1. Home
  2. Universidad de Santiago de Chile
  3. Publicaciones ANID
  4. Optimal Operation of Multi-Energy Carriers Considering Energy Hubs in Unbalanced Distribution Networks Under Uncertainty
Details

Optimal Operation of Multi-Energy Carriers Considering Energy Hubs in Unbalanced Distribution Networks Under Uncertainty

Journal
Sustainable Energy, Grids and Networks
ISSN
2352-4677
Date Issued
2024
Author(s)
Garcia-Munoz, F  
DOI
https://doi.org/10.1016/j.segan.2024.101538
Abstract
This article presents a two-stage stochastic programming model to address the dispatching scheduling problem in an energy hub, considering an unbalanced active low-voltage (LV) network. A three-phase version of the second-order cone relaxation of DistFlow AC optimal power flow (AC-OPF) is employed to incorporate unbalanced network constraints, while the objective minimizes the Local Energy Community (LEC) operational cost. The model results have been validated using OpenDSS, encompassing energy losses, voltage levels, and active/reactive power. Likewise, a comparative analysis between the three-phase model and the traditional single-phase model, using a modified version of the IEEE European LV Test Feeder as a case study, reveals interesting differences, such that the single-phase model underestimates voltage limits during photovoltaic (PV) system operation and overestimates energy purchased from the main grid, compared with the three-phase model. Similarly, the comparison results reveal that discrepancies between the single and three-phase models intensify as the power injected from PV systems rises. This notably impacts the total energy purchased from the grid, battery operation, and the satisfaction of thermal consumption through electricity. Finally, while the three-phase model offers valuable insights into security levels for voltage and grid energy purchase, its longer computational time makes it more suitable for strategic use rather than daily operational frameworks. © 2024 Elsevier Ltd
Get Involved!
  • Source Code
  • Documentation
  • Slack Channel
Make it your own

DSpace-CRIS can be extensively configured to meet your needs. Decide which information need to be collected and available with fine-grained security. Start updating the theme to match your Institution's web identity.

Need professional help?

The original creators of DSpace-CRIS at 4Science can take your project to the next level, get in touch!

Logo USACH

Universidad de Santiago de Chile
Avenida Libertador Bernardo O'Higgins nº 3363. Estación Central. Santiago Chile.
ciencia.abierta@usach.cl © 2023
The DSpace CRIS Project - Modificado por VRIIC USACH.

  • Accessibility settings
  • Privacy policy
  • End User Agreement
  • Send Feedback
Logo DSpace-CRIS
Repository logo COAR Notify